AGR Group factory production
Wind Generator Stator Component Welding Station
Factory robotic welding station for wind-generator stator components.
This case concerns welding automation for a wind-generator stator component.
Workpiece
Wind-generator stator component.
Production Challenge
Stator-component welding required reduced manual intervention and stable operation through coordination of the travel unit and positioner.
AGR Solution
AGR configured a FANUC robot, 2-axis travel unit, and L-type 2-axis positioner for coordinated motion.
System Configuration
FANUC robot, 2-axis travel unit, L-type 2-axis positioner, and coordinated motion for welding wind-generator stator components.
Implementation
Applied in production at an AGR Group structural-parts factory.
Case Results
Coordinated travel and positioning reduce manual intervention and stabilize stator-component welding.
Application Conditions
Similar stator-component welding applications can be assessed.
Engineering Highlights
- FANUC robot
- 2-axis travel unit
- L-type 2-axis positioner
- Coordinated motion
Media & System Views


Discuss a Similar Application
Drawings, workpiece photos, material, plate thickness, production volume, and current process help us make an initial assessment.
Discuss Your Application