AGR Group factory production

Stator and Rotor Welding Workstation for Wind Power

AGR Group factory workstation for wind-generator stator and rotor structural welding.

The robotic system is used in an AGR Group structural-parts factory. AGR is not the manufacturer of complete wind turbines or generator assemblies.

Stator and Rotor Welding Workstation for Wind Power

Workpiece

Welded structural components for wind-generator stators and rotors in the 4 MW–8 MW class.

Production Challenge

Large stators and rotors required repeatable automated welding while controlling variation in loading, unloading, and positioning.

AGR Solution

AGR combined operator-assisted loading/unloading, robotic welding, hydraulic fixtures, weld-position detection, and preconfigured welding programs.

System Configuration

Operator-assisted loading/unloading, robotic welding, hydraulic fixtures, weld-position detection for start-position location and offset correction, preconfigured welding programs, safety guarding, and interlocks.

Implementation

Applied in production at an AGR Group structural-parts factory. Component supply to turbine/generator manufacturers is distinct from the site where the robotic system operates.

Case Results

Case production is 4 rotors and 2 stators per 8-hour shift. UT inspection pass rate is 95% or higher. The case covers the 4 MW–8 MW class.

Application Conditions

Similar welded structural components for stators and rotors can be assessed.

Engineering Highlights

  • Weld-position and weld-start detection
  • Position-offset correction
  • Hydraulic fixtures
  • Safety guarding and interlocks
  • Configuration using a welding robot on a gantry with an L-type positioner. This is a separate project from the wind-support workstation.

Media & System Views

case-wind-content-01
case-wind-content-02

Discuss a Similar Application

Drawings, workpiece photos, material, plate thickness, production volume, and current process help us make an initial assessment.

Discuss Your Application